-
Pick up from the Woodmart Store
To pick up today
Free
-
Courier delivery
Our courier will deliver to the specified address
2-3 Days
Free
-
DHL Courier delivery
DHL courier will deliver to the specified address
2-3 Days
Free
Hurry and get discounts on all Apple devices up to 20%
Sale_coupon_15
₹999.00 Original price was: ₹999.00.₹819.00Current price is: ₹819.00.
To pick up today
Free
Our courier will deliver to the specified address
2-3 Days
Free
DHL courier will deliver to the specified address
2-3 Days
Free
Payment Methods:
Price: ₹999 - ₹819.00
(as of Oct 22, 2025 22:08:53 UTC – Details)
Get the best in performance and durability with the High Speed HDTV 4K Cable. Supporting 4K at 120Hz and 1080P at 240Hz, this cable delivers ultra-smooth video, sharp visuals, and lag-free display. With 100W PD support, it’s perfect for powering high-demand devices while transferring data. Built with a metallic connector head, tough tensile strength, and a heat-resistant, tangle-free outer layer, it’s made for long-lasting use. The 2-meter length adds convenience for various setups, and its universal compatibility makes it the ideal cable for TVs, laptops, monitors, projectors, gaming consoles, and more. Stay connected with speed, stability, and strength—all in one cable.
4K@120Hz & 1080P@240Hz – Enjoy ultra-smooth video and crisp visuals, ideal for gaming, streaming, and high-performance displays.
100W Power Delivery Support – Fast, stable power transmission suitable for high-powered devices.
Durable Build – Built to last with tough, tensile materials, metallic connectors, and heat-resistant design.
2M Cable Length – Long enough for flexible setups, perfect for home, office, or entertainment spaces.
Tangle-Free Design – Hassle-free cable management thanks to the flexible, non-tangling exterior.
In stock
In stock
In stock
In stock
In stock
Reviews
Clear filtersThere are no reviews yet.